Travel through time by exploring Hollywood.com's entertainment news archives, with 30+ years of entertainment news content. Type UF cable, Underground Feeder, is approved for direct burial when installed according to applicable electrical codes. conduit sizing see page 3-3-6 for metal conduit or intermediate galv. Typically, your service can be connected within two weeks of receiving a completed application. ELECTRICAL RISER DIAGRAM NOT TO SCALE *Use for Temporary Construction Power Pole and Single Family Service Change Only Main Switch must be located no higher than 2metres from the finished ground level. st ground surface front view side view pole locations must be determined by lub engineering department. POLES AND TEMPORARY CONSTRUCTION POWER A. Updated 09-27-2013. We will partner with you to provide safe and reliable electric service for your construction projects. How Power is Restored; Safety Programs; Safety Tips; Storm Preparation; Services. APPENDIX D - Underground Temporary Service Pole Specifications | A&N Electric Cooperative. Dig the post hole and set the post, tamping it in place. Full PDF Package Download Full PDF Package.

Each service must have a 15 or 20 amp GFI protected outlet installed and must have either a 30 amp 240 volt or a 50 amp 240 volt receptacle installed (see J on Figure 1). The 4/0 wires from the transformer will fit into the lugs in the in the panel. 125 Amp Metered Underground Only Temporary Power Panel. electrical power pole diagram for mobile homes and residential services all work shall comply with the 2014 national electrical code service wire sizing weather head underground feeders are be used they shall be conduit a depth and shall be buried deep, service feeder copper #2/0 sizing aluminum 6' grounding copper aluminum If poles are longer than the figures shown, then additional depth will be required proportional to the additional length above the ground. 10 Outdoor Metering Fig. Three Phase Transformer Concrete Pad. Custom Home Construction Temporary Power Wilkins Contracting Inc. Dye Electric Co If You Need A Temporary Power Pole Or Service Put Back On Your Home Give Us Call Estimate Upon Request 601 325 6784 2. An electric power system is a network of electrical components deployed to supply, transfer, and use electric power. Please contact Oncor for exceptions. 5. Another Temporary Power Pole Set Rector Electric Llc Facebook. 6 Current Transformer Connected May Pole, 120/240V 400 Amp Fig. 8. 4' min. 300 Underground Electric Service. Fig. Development of a Microcontroller Based Countdown Time Reminder with Visual and Aural Indicators. rigid conduit galv. Application for Membership.

Specifications. Our team provides the highest level of professionalism and ensures your temporary power pole is installed safely and to industry standards. 4x6 timbers are not acceptable, even for temporary or construction power poles.Be sure to tamp the pole solidly in the ground. Power Quality; Letters of Credit or Residency; Request Change of Mailing Address; Customer-Owned Meter Poles & Temporary Service Installations. 6. to our poles except by special permission from Eversource. 2412 Kramer Lane, Bldg. (D) Pole Attachment Services ; and (E) AE District Cooling. Temporary power complex (three-phase and/or underground) 2 weeks . C) Some installations require you to remove existing pavement or concrete slabs. Excavated soil MUST be compacted around pole in 100mm layers and thoroughly tamped. Added lead-time for a PROTECTED, 120 VAC WEATHER RESISTANT RECEPTICAL WITH IN-USE COVER All wiring must meet State of Tennessee wiring code and the National Electric Code (NEC). IDM H&S committee meetings for 2022 will be held via Microsoft Teams on the following Tuesdays at 12h30-13h30: 8 February 2022; 31 May 2022; 2 August 2022 If you need permanent electric service Mobile Home Repair. The following diagram (Figure 1) shows a good illustration and gives good information regarding your service for your Sketch 15a. 2. MH-5 Aerial RV Service Pole. We have noticed an unusual activity from your IP 40.77.167.13 and blocked access to this website.. D) Take the proper precautions to prevent dirt, concrete, or trash from entering conduits. Overhead Service Specifications The specifications for an overhead service mast and meter base. Digging into underground power lines can result in sev ere injury or death to the operator and others and can cause interruption of service to wide areas. please contact lub engineering department to spot location 3 - 5 days in advance of pole Such equipment when installed nearby shall be far enough away so contact with our facilities cannot take place during installation, removal, or by accident. Temporary Construction Services (Pole mount 200 amps or less) Temporary construction service Installations will be accepted if constructed in accordance with attached Diagrams 1-2 and must be: (a) Protected from the weather and mechanical damage by

Manufactured Mobile Home Overhead Electrical Service Pole Wiring Diagram.

YOUR SAFETY IS IMPORTANT safe. Sketch 16.

3 phase, 3 wire, 480 volts, 1200 ampere maximum. AE Network Design - Downtown.

Service Diagrams Grayson Rural Electric Cooperative Corporation. 512-505-7682. Planning to Install an Underground Electrical Service. Project Resources. Temporary Meter Pole (Builders Pole) Underground Load Connection Single Phase Meter up to 200A DRAWING 4.51 June 2014 NOT TO SCALE This document is available at www.fecc.coop FECC Member Installation Standards for The cost of the installation of the components can be anywhere between $500 to $1200+ depending on the materials and components used and if you do it yourself or not. OVH Temp Pole Construction The specifications for an overhead temporary pole.

Electrical Substation Now days the electrical power demand is increasing very rapidly. Type Pole Dimensions Round 5" Top Diameter Square 6" x 6" 2. 7 Self-Contained May Pole, 120/240V to 200 Amp Fig. New And Temporary Service Harrison Remc. Underground Request Use this form to apply for underground service. Find My Store. Step 3 Call 811 Someone will come out to the lot and use spray paint to mark all existing underground cable locations marked to prevent digging into one of them. F. Meter on MTEs Pole: MTE no longer allows standard meter installations on MTE poles. Service, Developer, Power Factor, Private Right-of-Way, Qualified Person, and Voltage s. Revised the definitions of Distribution Lines, Final Grade, FAA, Mobile Home, Select Backfill, Tariff, and Temporary Service. This Paper. CAPE CANAVERAL, Fla. (AP) NASA is launching a study of UFOs as part of a new push toward high-risk, high-impact science. Customer-Owned Meter Poles & Temporary Service Installations. UG-1: Services Greenbook EMWP Temporary Underground Electric Service Single-Phase, 120/240 Volt, 200 Amps Maximum 036670 Page 2 of 4 Rev. Not applicable ; 6 weeks . Prospective members will also need to produce identification that satisfies federal Red Flag guidelines. Request an Inspection through eTrakit. All clearances shall be as required by National Electrical Code. If you should have questions regarding these forms, please call a Kenergy Member Service Representative at 800.844.4832. Underground Meter & Equipment Rack up to 320 Amps Read Paper. Forms & Guides. Electric service page for builders and developers: order electric service, check job statuses, get help and find the information you need from Duke Energy. Member Services. 3. Download Download PDF. 3 phase, 4 wire, Wye 277/480 volts, 800 Ampere Maximum. 27 Full PDFs related to this paper. For fulfilling these huge power demands the modern time requires creation of bigger and bigger power generating stations. will not connect to a MULTIPLE POINT GROUNDING BLOCK (NOT REQUIRED FOR TEMPORARY POLE SERVICES) ON The following diagram (Figure 1) shows a good illustration and gives good information regarding your service for your 1.033 Three-phase power is not available in every part of the service area, especially in rural areas served underground or in isolated urban areas. The electrical grid can be broadly divided into the generators that supply the power, the transmission system that carries the power from the permitting@martin.fl.us . If your home construction project requires temporary electric service to poles or posts for power during building or renovation, Pacific Gas and Electric Company (PG&E) can provide this service. for pricing and availability. service to that customer are permitted on Company poles to a limited extent as covered by Company specifications. Advanced Three Phase PWM Inverter Control Using Microcontroller. Power system analysis and design 5th. Grounding The customer shall be responsible for bonding and grounding all If you are unsure which Design office to contact, view the Austin Energy Service Territory Map (pdf) to determine which office supports your service area. T.V.E.C. The benefits of underground power pole connections. #04: 07-31-15 9.

Temporary 1 Electric Service (120/240V and 120/208V Network) Overhead & Underground 1- Temporary Service Requirements Page 2 of 2 Revised 3/15/18 . Model # TL77RB. Ground the meter base per NEC. C (North of 969/MLK/Windsor Rd.) box 1411 302 north tennessee ave. laf011ette, tn 37766 (423) 562-3316 1-800-352-1340 4' min. If you are unsure which Design office to contact, view the Austin Energy Service Territory Map (pdf) to determine which office supports your service area. - consult with power company for requirements if round pole is used. Step 4 Install the meter base/ socket Heres where things get a little more fun. Added for a customer-owned and installed underground service lateral, if a customer increases the service lateral length or load, the customer shall be responsible to verify that Service upgrade simple (single-phase, overhead, 200 A or less) 2 weeks . At the end of your work, repair them as required. Underground Service Temporary Service Process For Temporary Underground Service, construct your Temporary Electric Loop and request Temporary Electric Service following the steps below: STEP 1) Apply for your Temporary Meter Loop permit with your local jurisdiction, such as the City of San Antonio. Each Diagram must be a single page, completely flattened, non-editable, PDF, less than 2MB. Details about new construction request. 512-505-7682. These power generating stations may be hydro-electric, thermal or atomic. 9 Temporary Service Entrance, Tripod Mounted Fig. underground temporary pole flex conduit laf ties p.o. 2412 Kramer Lane, Bldg. 3/4" rigid conduit bushing 1-1/4" close nipple 1-1/4" hub and gasket service panel with 20 amp weatherproof box and - consult with power company for requirements of guying or bracing due to unstable soil conditions or length of overhead feed cover with gfi recept. 72.54 KB PDF Underground Electric Service Information. 4.11 Service to Marinas over Water shore to ship power shall meet the requirements of Section 4.13 CONSTRUCTION OF AUTOMATIC WATER LEVEL CONTROLLER FOR BOTH OVERHEAD AND UNDERGROUND TANKS. Temporary Power Pole Specifications . When setting up temporary power systems, its important to adhere to specific guidelines to ensure you get the best performance and keep everyone safe, too. To properly set a pole, you should have at least two outlets available. Additionally, you must make sure it is mounted no further than 70 feet from Planning a new project can take a few months, so please contact us early to ensure timely service. Therefore, contact should be made with the Cooperative for service availability before specifying and purchasing equipment or wiring of buildings for three-phase equipment or motors of any size. Depending upon the availability of resources these stations are constructed Nokia-Smart Implementation Works for AC Power Upgrade Nokia-Smart Re Farm Project Nokia-Supply, Delivery and Fabrication of 380 sets AMB/RRU Bracket and 25 sets 3M Extension Pole PLDT-Enterprise Data Installation, Repair, Maintenance And Related Activities Smart-2015 C.O Turbo_Tower Conversion & Retro Smart-Cell Site Maintenance Program - pepco - single phase, 3 wire 120/240 volt meter wiring diagram 200amp oh service. Temporary Meter Pole Installation - Single Tips for Saving MoneySelect a good company. If you are paying to have the service done, you can save money by choosing a good company that offers competitive prices. Research the codes, rules, and permits beforehand. Doing a little bit of research up front can save you a ton of headaches down there road. Use your experience. Only pay for what you need. OH-5 Aerial Commercial (Up to 600 Amps) SG-1 Emergency Generator. OH-3 Aerial Residential Service (Mast Type) OH-4 CATV Ariel Service Pole. Underground Solutions. Payment is non-refundable. Meter Pole /Trailer Pole Specifications The specifications for a trailer pole. iii This Uniform Electrical Wiring Guide has been distributed in the past by these local power suppliers . Locate the meter within 2' of the handhole or transformer within the areas shown here. The wires are then laid over conduits or directly on the ground. Typical arrangement of instrument transformers and mounting for installation in instrument transformer cabinet underground service. Additionally, for multi-tenant buildings, the building addresses and direct current electricity from sunlight, which can be used to power equipment or to recharge a battery. The feedpoint is usually at the center of the dipole as shown in the diagram. pole on same side of street as building served us:'. MIRI is designed to take photos of distant or newly formed galaxies as well as faint, small objects like asteroids. Use to provide temporary outdoor electrical service at construction sites, marinas, mobile home parks and/or RV parks. Wiring diagrams are available below. XII Street and Outdoor Lighting Removed limit of one pole installed for the outdoor light Sep 2011 VI-B Metering Equipment Restriction on use of multiple conductor lugs Oct 2011 XIII Safety Replaced Notification of Facilities with updated version Jan 2012 VIII Grounding To reflect clarifications to 2011 NEC Article 250.52 Jan 2012 *All meter poles must be round. First, a trench deep enough to keep the power lines far away from objects and surface activities must be dug. Doors can be padlocked to help prevent power theft and vandalism. Underground Type Installation - Meter Socket - Single Phase. 100 to 300 feet. It is also the contractors responsibility to mark the placement of the temp pole. Installing Temporary Power Pole. As part of the first things first philosophy, you are going to need a temporary power pole. All building projects today require the use of power tools. If a ready source of power is not available, one must be supplied. If you will be needing 230 volts, you will have to alter the service in this diagram slightly by:running an additional wire between the buss lugs and connecting the second service lead to the free buss lugadding a 230 volt breakerproviding another weatherproof box with a 230 volt receptacle and a weather proof cover Underground power lines require a bit more work. customers requested installation date, temporary construction power will be provided at estimated cost. Holiday Closing (Monday, July 4) A&N Electric Cooperative will be closed on Monday, July 4th, in observance of Independence Day. meter base We urge you to use a qualified electrician to prevent safety hazards, additional costs and delays.

Find My Store. More than 1000 feet. Pole Replacement with a Pole Top Wireless Antenna 64 7. If you need underground solutions, our in-house design team can provide the power solution you need while our trenching, conduit and wire-pulling crews can get you connected quickly. 12 Installation of Metering Current Transformers Not sure. Text: 202-937-0892 . The trench is filled and the surface is returned to its original state. Approximate distance from nearest pole with transformer (overhead service) or transformer enclosure (underground service) Less than 100 feet.

Dickson, TN 37055 | Office Hours - Mon. 7. Diagram 1 - Temporary Service Structure 200A Max 22 Diagram 2 - Single-Phase Cable Service 200 Amp Max 23 Diagram 3a - Pole Mounted Service/Meter 24 80 PVC conduit may be needed if this is a multiple underground pole take-off.) AE Network Design - Downtown. B) Avoid and/or prevent damage to existing underground piping, conduits, and cables. Updated 09-10-2016. Power Pole Diagram. Request an Inspection. 11 Utility Metering Equipment - Summary Fig. UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Complete Service) UG 600 Amp or Larger Standby Generator Auto Transfer Switch (Partial Service) Underground Ditch Requirements. D) Take the proper precautions to prevent dirt, concrete, or trash from entering conduits. * Guide for Service Mast and Meter Base (Roof): GS1.0 Guide for Service Mast and Meter Base (Wall): GS2.0 Guide for Underground Meter Base: GS3.1 Guide for Underground Meter Base (2): GS3.2 Guide for Underground Meter Base (3): GS3.3 Guide for Overhead Meter Loop Pole: GS4.0 If you experience an Capital Credits Returned to Members in June. figure 16 - pepco - single phase, 3 wire, 120/240 volt meter wiring diagram 320 amp oh & ug service. pole on same side of street as building served us:'. E. ALL POLES MUST HAVE AT LEAST ONE G.F.C.I. POLES The minimum size of a wood pole used to support low voltage (below 1000 Volts) conductors in conformance with Article 225 of the California Electrical Code (CEC) for outdoor feeders and branch circuits shall be 6 inches by 6 inches (nominal) if square, or have a diameter of at least 5 will not connect to a UNDERGROUND TEMPORARY SERVICE ALL TEMPORARY POLES WILL BE SPOTTED BY TVEC FRONT Meter poles must also be buried at a minimum of 4.5 feet below ground level at an approved location by a Sam Houston Electric Cooperative inspector. Ordinarily, no rental charge is made for such attachments. 300 to 1000 feet. We constantly track our performance Any apparent discrepancy, omission, error, or requirement necessitating further explanation or interpretation in this Design Criteria should be referred to AE Design for final explanation or determination of AE requirements. Point of Delivery The point as designated by the Company where the Company's overhead service drop, underground service lateral or transformer secondary bushings connect to the customer's service entrance conductors. Professional electrical contractor offering same day t-pole installation service, free estimates-call 281-337-5060. 5. steel mast when necessary to csiain wire clearance service mlnimum clearance ai alff point above f.oaoway not less than is feet 14 ft. mf~!mtj.i building and pole on opposite sides of street service head must be accessible br ladder from finished grade level. 10 weeks ; 10 weeks . Underground Overhead Grounding Electrode Conductor Size #6 #4 #2. Find this Pin and more on power pole diagram by Charles Billue. Therefore, this is comparable to a Hertzian dipole with an effective current I OPTIONAL SERVICE POLE WITH GALVANIZED CONDUIT MAST Alabama Power A-OVERHEAD DISTRIBUTION 6 GANG HORIZONTAL METER SOCKET 08-12-20 R-02-3 R-02-03 CUSTOMER: 1. Pole- Treated for ground contact 16 ft., 4 ft. deep, tamped. If the power crew arrives at the job site and the pole location is not clearly marked, there will be a delay in installation, resulting in setbacks on the job site. UG-1 Single Phase Underground Construction Pedestal.

for pricing and availability. Here is a standard Temporary Power Pole assembly issued by the utility company that always seems to work if you follow it to the letter. 4411-B Meinardus Drive. steel mast when necessary to csiain wire clearance service mlnimum clearance ai alff point above f.oaoway not less than is feet 14 ft. mf~!mtj.i building and pole on opposite sides of street service head must be accessible br ladder from finished grade level. To sign up for new electric service with Volunteer Energy Cooperative prospective members will need to fill out and sign the cooperatives Application for Membership and Required Additional Information forms. An example of a power system is the electrical grid that provides power to homes and industries within an extended area. Your costs will depend on the design, height, and construction material of the post or posts you use. Navigation. UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL UT0001M VOLUME 17 ENGINEERING & CONSTRUCTION STANDARD UT0001M UNDERGROUND ELECTRIC TEMPORARY Drawn: Eng: Appr: Date: SERVICE PANEL Revision: 9 JL NP DA 08/19 Page 2 of 6 NVE will furnish and install the service cable and connectors from the source to load cables, Underground - Temporary service pole must be located behind right corner of pad mount transformer or underground secondary box. AE Design North - Kramer Lane Service Center. Both parties will come up with the desired location on where the temporary pole will go. By Hassan Odawn. 4411-B Meinardus Drive. Temporary Construction Pole Electric Service Requirements 60 200 AMP Capacities, 120/240-Volt Single-Phase A. ATTACHMENT: The customer must provide point of Greeneville Light and Power System 423-636-6200 www.glps.net Revised May 29, 2002. All inspections requested by 7:00 p.m. Monday through Friday will be scheduled for the following business day. Single phase temporary power poles; Overhead and underground services available; Standard 125 amp-larger services available upon request; C (North of 969/MLK/Windsor Rd.) your service pole and height of your service pole. 3.2 . couplings & detail - f fabricate from 10 length of rigid conduit or intermediate metal conduit pvc, galv. T.V.E.C. B) Avoid and/or prevent damage to existing underground piping, conduits, and cables. The current along dipole arms are approximately described as proportional to sin(kz) where z is the distance to the end of the arm.In the case of a short dipole, that is essentially a linear drop from at the feedpoint to zero at the end. Service Drop Cable: It is the cable between the utility pole and the consumers premises or building. If the project is adding to an existing system, the diagrams need to include a representation of the existing system. STUART, FL 34994 (772) 288-5916 . The pole and its installation will be one cost and that can get to $1000+ or less depending on the type of pole you use. Receptacle left is NEMA 14-50R OH-1 Single Phase Construction Pole. These specifications include attachments of farm customers, certain installations on private property, underground services, and temporary services. is required . OH-2 Aerial Residential Service. Big Sandy RECC Paintsville, KY 606-789-4095 Guying of the meter pole may also be required for New Service Information. Big Sandy RECC Paintsville, KY 606-789-4095 11.8-1 Self-Contained Meter Wiring Diagrams up to 320A. Rugged, heavy-duty, 100% galvanized-steel enclosure is coated for durability. figure 17 - pepco - three phase, 4 wire, 120/208 volt meter wiring diagram 400 amp. 30 Amp Overhead/Underground Temporary Power Panel. 5 . A standard temp pole only has two 20A 120V circuits GFCI protected, and one standard 20A 2P 240V circuit connected to a suitable receptacle, but non GFCI protected. We design, set up and maintain temporary underground power projects for any application. front view aluminum conductor 5 ft from groud level 12 ft from ground 6copper ground rod side view brace boards back toward pull off pole I'm setting up a temporary underground power pole. 512-505-7181. Request an Inspection by Phone: 864-968-7029.

4.10Changed section title to High Rise Building Service with the requirement for customers to Consult the Companyfor interior meter room locations . Ee297 B. Download Download PDF. The residential wiring from the utility pole to the appliances or devices inside the home is divided into mainly five types. Mobile Home Redo. Permanent service connections will receive priority over temporary service. Electrical Permit. AE Design North - Kramer Lane Service Center. It is fixed on the pole with 4 channel steel, the plane slope is controlled within 1%, and the height from the ground should be moderate. PEC requires that all construction meets or exceeds these specifications prior to service connection. Trained personnel will locate Please call 800.750.4000 (for residential) or 800.565.3181 (for commercial/industrial) for more details.

underground service 3-2-11 design practices or damage arising from the use of this specification diagram. C) Some installations require you to remove existing pavement or concrete slabs. Siemens. to Fri. 8 am 5 pm | descustomerservice@dicksonelectric.com Facebook; Twitter Well pump wiring diagnosis & repair: this article describes troubleshooting a submersible well pump that was causing tripped circuit breakers and that pumped water only at a slow, reduced rate and pressure. 4.5 Customer shall providerequiredground clearancefor all temporary services. Ultimately using some simple electrical tests the homeowner traced the water pump problems to a nicked well pump wiring circuit wire. requirements (E-plans which include load calculations, power and voltage requirements, size of service, riser diagram, etc .) 11/17/2010. Include crushed stone for stability if needed. 512-505-7181. Customer Supplied Pole Mounted Overhead Crow Wing Power. At the end of your work, repair them as required. Electrical Plan. Service 600.03 meter poles 600.04 temporary electric service 600.05 drawings figure 6001 typical permanent service drop figure 6002 max attachment height for steel conduit mast de for standard service drop figure 6003 overhead service to multiple weatherheads figure 6004 overhead temporary service pole clearance and meter Meter Poles Sumter Emc. The DEMCO Service Entrance Specification Book is a guide that explains the service entrance requirements for electric connection. When a MTE pole is changed out, any meters on MTEs poles shall be removed if possible. The service drop cable is an overhead electrical line from the pole to the service weatherhead of a house. your service pole and height of your service pole. Temporary service installing power pole wiring diagrams specifications specs lawrenceburg utility a n electric cooperative sumter emc holston inc underground lane 200 amp meter installation grayson rural Temporary Service Installing Temporary Power Pole Wiring Diagrams Specifications Specs Diagrams Lawrenceburg Utility Systems Temporary Service Appendix D The information contained in this manual is intended to provide electrical contractors, architects, building contractors, engineers, and other customers with the specific technical information needed for determining acceptable methods of receiving electrical service from the PUD. Electric Service Handbook 2022 Non-residential Projects Our commitments to appointments and service We stand behind our service to you. 8 Customer Owned Pole for Non-Fixed Premise Fig.

Customer Requested Underground Relocations 64 7. Temporary power simple (single-phase, overhead, 400 A or less) 2 weeks . The final instrument to boot up on Webb was the Mid-Infrared Instrument, or MIRI. Author: DWAYNE WELLS Created Date: Please confirm that you are not a robot See ESG-7 for specification details. Receptacle center is NEMA 5-20R2GF. not be started until underground facilities have been located. New Construction Otero County Electric Cooperative Inc. 200 320 Overhead Service On Meter Pole. I have an outdoor 100 a service panel with a meter socket included. iii This Uniform Electrical Wiring Guide has been distributed in the past by these local power suppliers . Other MARTIN COUNTY BUILDING DEPARTMENT 900 SE RUHNKE STREET . Markups of We've created a self-service hub for all the information and resources you'll need before, during, and after your electric or gas project. 8 weeks ; 8 weeks . Underground service. Electrical Some people put in short power poles with underground wiring to keep the costs lower. Call ProLectric. Temporary Power Poles Santa Fe Texas Prolectric Electricians. Temp power poles are self-contained, distinct services that are erected with an outside weather-resistant meter temporary service panel. By Charles Udekwe. A short summary of this paper. Model # 19800102. Small Load or Temporary Meter Pole Installation. meter pole until approved by Tennessee deputy state inspector SIDE VIEW OF UNDERGROUND TEMPORARY POLE MINIMUM OF 6 CIRCUITS 8' 6"X6" GROUND LEVEL GROUND LEVEL National Electric Code (NEC). The AE Design Criteria is available online at no cost. If you look in the right locations, you could find used temporary power poles for far less than a new one will cost you. (615) 446-9051 | 236 Cowan Rd. Need a temporary power pole installed? Contact PUPS at 1-888-721-7877 at least 72 hours before you dig. Each service must have a 15 or 20 amp GFI protected outlet installed and must have either a 30 amp 240 volt or a 50 amp 240 volt receptacle installed (see J on Figure 1).